I have started work again on the wing. I have riveted the airleron bellcrank support ribs in. All the gas tank nutplates have been installed (all 128 of them). I have installed the pitot tube line and adel clamps. I am working now on getting the .032 stiffener angles drilled onto the bottom of the tank skin. I have to cut all of the access plates in the back of the tank baffle. Then I can start dimpling, etching and riveting the tank together. What fun!
I will get some pics of the updates on the wing soon.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment