Friday, March 30, 2012
Firewall
I have the firewall all riveted together. It has taken a long time to get to this point since there is so many things that are mounted on the firewall. The batter box, starter/master solenoids, brake fluid resevoir, heat box, ground strap, all cable penetrations and sending unit block. The list goes on and on. All of these items has to be located, drilled and mounted so they all fit. After that is done, then you have to fit the engine mount to the firewall and drill all six holes. I have started drilling the engine mount as I need these holes in the firewall so I can mount it in the jig. The engine mount will also help me locate more items like the fuel line penetration and a few other things. I still have to seal around the prop governor box and then paint the angles grey for the interior color. This way I will not have to do it later which is a real pain to mask off when it's in the plane. I still have about two or three days more work to go this thing before I can set it aside and work on another bulkhead.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment